Direct answer
After PBJ moved to iQIES in 2026, CMS kept the same core counting rules for Medicare- and Medicaid-certified nursing homes: report paid hours worked onsite, include required contract and agency labor, deduct 30 minutes for each full shift, exclude remote nursing time, and submit by the 45th calendar day after quarter-end.
Key takeaways
- The August 17, 2026 move to iQIES changed the submission platform, not the PBJ counting rules or quarterly deadline.
- PBJ applies to Medicare- and Medicaid-certified long-term care facilities subject to 42 CFR Part 483, Subpart B, and does not apply to swing beds.
- Agency and contract hours are required in PBJ, and each contract or agency worker must have a unique employee ID.
- Mixed-duty nurses can be split across job codes when the worker truly changed primary role during the day.
- Schedules alone do not rebut an RN coverage question; CMS wants timecards, timesheets, or payroll records.
ePeople AI, compliance software for skilled nursing facilities, should treat the 2026 PBJ move to iQIES as a platform change, not a rule change. CMS kept the same counting framework: PBJ still follows paid hours worked onsite, still requires contract and agency labor, still requires a 30-minute meal-break deduction for each full shift, and still excludes remote nursing time.
Last updated: November 13, 2026.
The hard part is not the upload screen. It is the worker-by-worker judgment call before quarter close: does that mixed-duty RN belong under an administrative code, a floor code, or both? Does a corporate clinician's chart review count if it happened from home? Can a facility rely on the schedule when PBJ suggests a day without enough RN coverage? CMS answered those questions in the PBJ manual, PBJ FAQ, surveyor guidance, and the current Care Compare users' guide.
For staffing teams trying to connect shift coverage to reporting, the workflow matters before quarter close. In AI PPD Staff Planning & Scheduling, **ePeople schedules against the building's PPD requirement and flags a staffing gap while the shift can still be filled.**
Which facilities still have to submit PBJ after the iQIES move?
PBJ still applies to long-term care facilities subject to 42 CFR Part 483, Subpart B. CMS says that includes Medicare- and Medicaid-certified nursing facilities and does not include swing beds. The iQIES transition did not narrow the reporting group or create a new exception for facilities that changed software or submission workflow.
Did iQIES change the deadline or just the submission system?
It changed the submission system. CMS moved PBJ into iQIES on August 17, 2026, and also said the reporting requirements and quarterly deadlines did not change. Submissions are still due by 11:59 PM Eastern on the 45th calendar day after the quarter ends, and the last accepted file before the deadline becomes the facility's final submission.
PBJ rules that did not change with the 2026 iQIES move
| Question | Current CMS answer | Why it matters operationally |
|---|---|---|
| Where do facilities submit PBJ? | Through iQIES as of August 17, 2026 | Access, validation, and file acceptance now run through iQIES |
| Did the quarter-end deadline change? | No; deadline remains the 45th calendar day after quarter-end | Late or unaccepted files still create rating and survey risk |
| Did CMS change who must report? | No; certified long-term care facilities still report, swing beds do not | Facility scope stayed the same |
| Did CMS change which hours count? | No; PBJ still follows onsite paid hours and existing exclusions | Coding rules for mixed-duty, contract, and remote work still matter |
Which worker types and hours count in PBJ?
CMS centers PBJ on paid hours worked onsite. The August 2026 PBJ manual keeps distinct nursing job codes for Director of Nursing, RN with administrative duties, RN, LPN/LVN with administrative duties, LPN/LVN, CNA, nurse aide in training, and medication aide or technician. Facilities should report hours under the code that matches the work actually performed rather than collapsing all nursing time into one bucket.
Contract and agency labor also counts. The PBJ regulation requires complete and accurate direct-care staffing information, including agency and contract staff, and requires facilities to distinguish employee hours from contract hours. CMS's FAQ adds that each contract or agency worker must have a unique employee ID in the PBJ file.
How do mixed-duty nurses count when they split the day?
CMS says reporting is generally based on the employee's primary role, but the FAQ allows a split when a worker truly changed primary role during the day. CMS gives the example of a nurse who spends part of the day in administrative duties and part in resident care. In that case, the facility may split the hours across the applicable nursing job codes.
That matters for DONs, ADONs, and unit managers. If the same licensed nurse spent real floor time and real administrative time on the same date, PBJ does not require the building to force all hours into one side of the job. It does require the building to map those hours to the work actually done and keep enough support to explain the allocation later.
**Example:** A mixed-duty RN is paid for a 12-hour shift. She spends 7.5 hours covering resident care, 4 hours on administrative follow-up, and takes one meal period. PBJ deducts 30 minutes for the meal break, leaving 11.5 reportable hours to split across the applicable RN codes based on the work actually performed that day.
Do agency, contract, corporate, or hospital-based staff count?
Agency and contract hours are required, not optional. CMS says facilities must report those hours and assign each contract or agency worker a unique employee ID. Shared hospital-based or corporate staff can also count, but only to the extent their onsite hours are allocated to SNF or NF residents. Hours spent serving non-SNF populations stay out.
That narrower rule matters for floating clinical staff. A wound nurse, consultant clinician, or other shared resource cannot be reported with a blanket monthly estimate if some of that time served other settings or populations. PBJ only takes the portion allocated to SNF or NF residents, so operators need worker-level support rather than a general contract total.
Which hours must stay out of PBJ even if the worker was paid?
CMS draws several bright lines. Leave, unpaid time, non-work-related absences, and meal breaks do not count. The PBJ manual also says all nursing hours must be worked onsite, so off-site or remote nursing hours are not reportable. That excludes work-from-home chart review, remote survey preparation, and similar off-site monitoring work.
CMS also excludes practitioner visits billed to Medicare or another payer, hospice staff hours, and private-duty nurse hours. Those services may happen in the building, but they are not PBJ-reportable facility staffing hours under the current CMS manual and FAQ.
What does CMS expect for meal breaks in PBJ?
CMS expects a 30-minute meal-break deduction for each full shift for PBJ purposes. The FAQ says that applies even if payroll or timekeeping shows a shorter meal period or the worker was paid through lunch. CMS also says a shorter break reflected in timekeeping records, by itself, does not make the PBJ file noncompliant if PBJ reporting follows the 30-minute deduction rule.
Common PBJ counting decisions for skilled nursing operators
| Scenario | Count in PBJ? | CMS treatment | Proof to keep |
|---|---|---|---|
| Employee RN providing onsite resident care | Yes | Report onsite paid hours under the RN code | Payroll records or timecards |
| Nurse who truly split the day between admin and floor | Yes, split if primary role changed | Allocate hours by role actually worked | Role-based time detail |
| Agency or contract CNA | Yes | Report required contract hours with a unique worker ID | Invoice, contract, and worker-level time detail |
| Corporate nurse reviewing charts from home | No | Remote nursing hours are not reportable | Separate payroll or internal coding |
| Paid meal period during a full shift | No | Deduct 30 minutes for PBJ purposes | PBJ adjustment method plus payroll/timekeeping support |
| Hospice staff or private-duty nurse in the building | No | Exclude from PBJ | Service or billing records |
| Practitioner visit billed to Medicare or another payer | No | Exclude from PBJ | Billing support |
| Date flagged for missing RN coverage | Possibly rebuttable | Need records showing 8 consecutive onsite RN hours | Timecards, timesheets, or payroll records |
What about staff in training or universal workers?
CMS's FAQ treats these as role-and-availability questions. For universal care workers, CMS says the facility should report the CNA hours and may use optional nonrequired categories for the rest if it chooses. For staff in training, CMS says hours are not reportable when the worker is unavailable to perform the primary role because the person is in class or otherwise engaged in training instead of resident assignment.
That means the payroll record alone is not enough to answer the PBJ question. The operator still has to ask what role the person was available to perform during those paid hours and whether those hours were onsite resident-care staffing time under CMS rules.
What proof matters for RN coverage questions?
When PBJ data suggests a day without required RN coverage, CMS survey guidance allows the facility to rebut that conclusion, but the proof standard is specific. Appendix PP says acceptable evidence is timecards, timesheets, or payroll information that clearly shows RN coverage on the date in question. A schedule showing who was supposed to work is not acceptable.
CMS also tells surveyors to understand PBJ meal-break deductions when reviewing possible RN infraction dates. So a deducted meal period in PBJ does not automatically mean the building lacked 8 consecutive onsite RN hours. But if the building wants to rebut the PBJ signal, it needs actual work records, not planned staffing records.
What are the consequences if PBJ is late, inaccurate, or shows no RN hours?
The consequences go beyond a rejected file. CMS survey guidance ties failed PBJ submission to F851 risk. CMS's Five-Star users' guide says providers that fail to submit staffing data by the required deadline receive a one-star staffing rating. It also says facilities with 4 or more days in the quarter showing no RN hours receive a one-star staffing rating, and facilities that fail PBJ audits can receive the same result.
CMS's October 2024 QSO memo also added a turnover consequence: providers that fail to submit staffing data or submit erroneous staffing data receive the lowest corresponding turnover scores. For operators, that means PBJ coding and proof controls now affect more than one public-facing staffing measure on Care Compare.
What proof set should an operator keep for quarter close?
For the edge cases that create most PBJ cleanup, the proof set is usually simple but specific: payroll or timecards for employee hours, worker-level agency records tied to unique IDs, contracts or invoices that support shared-staff allocation, and role-based detail when one licensed nurse truly changed duties during the day. For RN coverage disputes, CMS points back to timecards, timesheets, or payroll records rather than schedules.
- Employee payroll records or timecards for onsite nursing hours
- Agency and contract worker detail tied to a unique employee ID
- Allocation support for shared corporate or hospital-based staff
- Role-based detail for mixed-duty nursing shifts
- A documented PBJ meal-break adjustment method
- Billing or service records showing why excluded practitioner, hospice, or private-duty hours stayed out
- RN coverage proof built from actual worked-time records, not schedules
What changes when the staffing workflow starts before PBJ quarter close?
The practical difference is timing. If a contract worker is missing a unique ID, if mixed-duty hours are mapped to the wrong code, or if remote review time is blended into onsite nursing hours, those problems are easier to correct before payroll and PBJ files are finalized than after a validation problem or rating consequence appears.
Operators already working through PBJ due dates and iQIES workflow, PBJ audit prep, and PPD meaning in a nursing home usually need one system for shift coverage and another for quarter-end proof. Starting earlier reduces the number of PBJ questions that have to be reconstructed after the fact.